Substation relay protection data management information system

1 System overall design relay protection tester

This system uses VC 6.0 as a development tool. The system has the following main functions.

Set permission level: 3 levels are set, which are super administrator level, administrator level and ordinary user level, and the permission range of each level is different. Ordinary users can browse, calculate data, obtain quality analysis data, and print data; administrators can add, modify, and delete data in addition to ordinary users' rights; super administrators can add Cancel and delete users and edit setting database.

Data editing: The relay protection tester uses a variety of methods to enter data, set default values, record copy, paste, delete, insert, etc. Adopt a more intuitive, consistent with the original manual report style table control MsFlexGrid to display data, easy to operate.

Data output: Data output includes the output of data tables and data analysis views. The manual report of the Power Supply Bureau is irregular and nested, and the effect of inputting data into the data report and then printing is obviously not good, and the general printing method cannot meet the requirements. In order to comply with the original manual tabulation format, the system uses the Printer object for special printing programming. In the output of data charts, with the help of spreadsheet EXCEL, its powerful chart analysis function can meet various requirements.

Data sharing: In the current database system development process, the client / server architecture occupies the main position in this field. VC 6.0 can easily and efficiently complete the development of this database system. With the help of the ADO model, the internal LAN can be realized more simply and flexibly. data sharing. In the local area network, users only need to know the IP address of the server, and can connect to the server through the client program to achieve data sharing.

Security: data entry, modification, and query have functions such as confirmation and cancellation to avoid errors such as data loss due to misoperation. It has the self-checking function of the integrity of the database files; there are special module designs for data confidentiality, backup and recovery, which ensure the absolute security of the data.

2 Structure of the program system

According to the power communication protocol, the entire program function module of the relay protection tester can be roughly divided into the following eight categories:

The self-description part of the device (initialization class), that is, the server directory, logical device directory, logical node directory, and data directory (data definition), these services are in a progressive relationship, operating sequentially, and the order cannot be reversed; data services Data set service; set group control; report control; record control; remote control; file.

The program can be divided into two parts according to the power communication protocol function standard: ACSI (Abstract Communication Service Interface) and MMS (Manufacturing Message Specification).

The program C / S mode can be divided into two parts: the client and server of the relay protection tester.

3 Design of main modules and database of the system

The main modules of the system are data editing module, statistical analysis, data output, security maintenance and user editing module.

3.1 Design of data input and display module

The system widely uses the FlexGrid control in the data input relay protection tester and display. Because the FlexGrid control does not have an editing function, the system specifically uses the TextBox text box for programming. First hide the TexBox text box. After clicking the input, modify or add buttons, and then click the corresponding MsFlexGrid control, the text box appears, which is convenient for the operator to edit the data; when the mouse clicks elsewhere, the TextBox text box transfers the content Give the Ms-FlexGrid control, and then the operator clicks OK to save the changes or click Cancel to restore the previous data as needed. In order to make the FlexGrid control more suitable for Chinese reporting habits, the specific rows and columns of the FlexGrid control have been added and deleted.

3.2 Design of data output module

The format of the original manual tabulation of the Power Supply Bureau is a typical Chinese table format, and the data table is irregular and nested. Although VB has powerful data processing capabilities, it lacks sufficient data table output function that the relay protection tester conforms to Chinese habits. Although the Crystal Report control and Crystal Reports program can be used to output reports, the operation is cumbersome and the Chinese processing ability is not ideal, especially it can not be used to create tables with uncertain content. In order to comply with the original manual tabulation format, the system uses the Printer object for special printing and programming, and compiles a general data table output control, which can automatically generate a two-dimensional Chinese table based on the results of statistical analysis and print it out.

3.3 Design of data security module

In terms of data security, it includes design to avoid misoperation during data editing, confidentiality design of the database of the relay protection tester, and design of regular backup of the database. To prevent misuse of data, use the "transaction" method (ie Begin Trans, Commit Trans, Rollback and other transaction statements) [3]. In addition to the database file can be opened in this system, browse and modify the relay protection tester, it can also be opened, browsed and modified in various other system software and application software, so the confidentiality of the data becomes important. Simply setting a password often fails to meet the requirements. For the database itself, the system encrypts the data files in assembly language. In terms of regular backup of database files, the system applies the file copy statement FileCopy to the database backup [4], which can complete the task well after debugging.

4 System operation

Figure 1 is the main flow chart of the system operation.

Substation relay protection data management information system

Figure 1 Main flow chart of system operation

5 Conclusion

The use of the data management system of the substation enables centralized management of all fixed value orders of the relay protection, which greatly improves the working efficiency and management level of the protection personnel. The preliminary application of this system shows that the system has reasonable design, complete functions, beautiful software interface, convenient operation, easy maintenance, stable and reliable operation, fast and accurate output results, and meets the needs of power supply bureau relay protection. The remote control provides reliable technical data and also lays the foundation for the realization of condition maintenance.

The system is based on the IEC 61850 international standard communication protocol. The relay protection tester is suitable for all communication fields in the field of power automation, such as substation automation, dispatch automation, hydropower plant automation, wind power monitoring and control system, relay protection management information transmission and power grid Information transmission in fields such as security and stability control, and the entire industrial process control field, such as petroleum-based, chemical, railway, CNC machine tool, and robot-based network data collection and monitoring.

Multi Gym Station! Our Multi Jungle Series offers gorgeous training options with variety multi-function equipment to appeal to exercisers at all fitness levels and abilities. These cable motion multi jungle equipment offering an perfect workout experience for exercisers in all fitness centers and health clubs.

Multi Jungle

Gym Multi Jungle, Multi Function Machine, Exercise Equipment, Exercise Bike, Exercise Equipment Gym, Health Fitness Equipment, Sports Fitness Equipment, Affordable Fitness Equipment

Guangzhou Kangyi Sporting Goods Co., Ltd. , https://www.ganasgym.com

Posted on